My recommendation: Freeze transfers from WH-PHX-04 immediately to stop further drift. Open a discrepancy task force to physically verify the 22 missing items. Generate the audit evidence packet for the controller. Notify the operations lead.
The GL reserve adjustment likely required next close cycle is ~$184K if all 22 items are confirmed missing. Could be lower if the badge printers are simply mis-located.
I have drafted all four actions. They await your one-click confirmation. I will not freeze the facility, close RMAs, modify technician access, or adjust GL on my own. Each goes through its proper change-control path.